Your first run, without the expensive mistakes. From 100 units per style — sample first, factory-direct.
A factory quotes 100 units — then counts it per colour. Your 3-colour hoodie is suddenly 300 units. Here the 100 is per style, colours split inside.
Paying for 300 units of a fit you’ve never held. Every order here starts with a pre-production sample you approve — bulk only moves after your sign-off.
Guesses come back as returns. If you don’t have a tech pack, we build it with you during sampling — specs, measurements, construction, all written down before bulk.
Send what you have — a reference garment, photos, sketches, measurements off a piece you like. We turn it into a proper tech pack with you: pattern, grading across sizes, fabric and trims, construction details. By the time your sample is approved, your brand owns a spec that any future run can repeat exactly.
A launchable first collection — not a warehouse of one design.
A tech pack, reference photos, or even a sketch — send what you have and we take it from there.
We spec fabric, GSM, trims and measurements, and send a per-unit factory costing.
One physical sample with your print, embroidery and labels in place. You approve it before bulk starts.
Cut-and-sew of your full run, with QC checks on stitching, measurements and finish as it moves down the line.
Packed, labelled and shipped worldwide — door to door, customs handled.



Our floor. Your first run.
Send your design or a reference piece. You get a per-unit costing, we build or fix the tech pack, you approve a sample, then bulk runs. One point of contact the whole way.
Yes. A reference garment, photos or sketches are enough to begin — the tech pack gets built with you during sampling, before any bulk commitment.
100 units per style, with colours and sizes split inside that 100. Two styles at 100 each is a complete first drop.
It depends on the product, fabric and finish — which is why the costing comes first, per unit, before you commit to anything. No middleman margin on top.
Most projects run 4–12 weeks end to end, depending on fabric and complexity. Your timeline comes with the costing.
Yes — that is the point of starting properly. Your patterns, grading and specs are on file, so run two is the same product at bigger numbers, not a new negotiation.
Want your own labels and tags on every piece? See how private label works →
Send us the style you're planning. You'll get a real costing from the factory floor — no middleman, no 400-unit trap.
Or email us at info@customapparel.studio